window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-191060862-1');
Logo

CASTLE Integrity Group

Castle Integrity Group specializes in all integrity-related projects, big or small. Whether it’s maintenance, testing, or upgrades we’ve got the experienced team for the job. Our project teams have proven themselves time and time again to be one of the industry leaders in safety and quality. We pride ourselves on solid, lasting work.

MAINTENANCE

Pipeline Evaluation Anomalies
Pipeline Recoats
Pipeline Painting & Sandblasting
Pipeline Lowering
Pipeline Abandonment
Build/Install Pipeline Access Roads
General ROW Maintenance & Remediation
Fencing
Clearing

TESTING

Hydrotesting
Nitrogen Testing
Cleaning & Drying
Pipeline Pigging & Assistance
Commissioning
Decommissioning

UPGRADES

Pipeline replacements
Installation of service lines to upcoming factories/industries/plants
Valve installations
Make piggable projects
Launcher & Receiver installations & modifications
Hot taps
Interconnects

Featured Projects
Project Name18” MAINLINE HYDROTEST CS 21 TO 20-5R / 18” MAINLINE VALVE
LocationSOUTH FLORIDA
Hydrotest 33.3 miles of 18” mainline from CS 21 to MLV 20-5R. Consist of cutting and isolating each end of the mainline. There are 11 spots ranging from 4” to 18” along the pipeline to be isolated, installed an 18” MLV.
Project NameNGPL GC2 REMEDIATIONS
LocationNORTH EAST ARKANSAS
Castle completed remediation on 92SCC anomalies consisting of recoats and 3,416’ of pipe replacement.
Project NameNGPL AMARILLO LINES MAKE PIGGABLE BETWEEN CS 106 AND CS 108
LocationIOWA & NEBRASKA
42” barrel removal and relocation, replace 2-26” tee’s, replace approximately 2,900 LF of dual 20” with 2,900 LF of 26”, fabricate and install 1 – 36” barrel, replace 1 – 26” MLV, replace 1 – 20” crossover valve, install 1 – 30” riser for temporary launcher, install 1 – 36” riser for temporary launcher and remove 48” drip, remove 2 – 36” drips and install 1 – new 36” drip, install 700 LF of dual 20” with 36” crossover and 2 – 30” risers.

Need a project completed?

Contact Us