We tackle any length project up to 48″ pipe and will supply manpower and equipment to meet the specific project needs. We have a history of completing sophisticated multi-million dollar projects and are skilled in the mainline division from marsh work to congested construction and everything in-between.

MAINLINE PIPELINE

Mainline projects can span across the entire Continental U.S., so we do too. Castle offers unlimited miles of pipeline construction throughout North America with pipe sizes as large as 48″.

MARSH/SWAMP PROJECTS

Our Louisiana office is strategically located and has easy access to the Gulf Coast region for projects requiring inland marine pipeline construction and/or integrity work.

CONGESTED CONSTRUCTION

Problem-solving is our forte. We are diversified to handle congested construction in urban areas, as well as power line and corridor work.

MIDSTREAM

Midstream projects require finesse. At Castle, we have decades of experience in the installation of intricate pipeline systems, from large to small, and skilled team members on-hand for every potential stage of a project.

SPECIAL PROJECTS

Our Clients sometimes have projects that are complex or need to be installed within difficult areas, terrain, permitting, environmental or schedule challenges. Castle has a diverse group of tenured personnel to engage with companies in the planning and developing of these projects.

ENGINEERING, PROCUREMENT & CONSTRUCTION

Topographic Survey
Permitting
Engineering & Design
Procurement
Construction
As Built Survey
Commissioning

Featured Projects
Project NameCOMSTOCK PROJECT
LocationEAST TEXAS
Castle installed 28.12 miles of 30” mainline from Carthage to Waskom, Texas. The project also included (30) Bores, (5) Cased Bores, (3) HDDs, (3) MLVs, and associated Launchers/Receivers.
Project NameBRIDGETEX
LocationCentral/Southeast, Texas
Installation of nearly 100 miles of 20" and 24" mainline. The 24" was along the Centerpoint Corridor and had over 125 bores and HDD's.
Project NameGRAY OAK
LocationSOUTH TEXAS
Gray Oak was a mainline project with 171 miles of 20’’, 45 miles of 16’’, & 8 miles of 12’’ pipeline.